Designing, constructing,
delivering and testing the electrical equipments for
the transformation station of 66/20 KV in the sixth
section of reclamation project in Alfurat bottom Basin.
For the General Company for Hydro projects
 Transformers
66/20 KV, Capacity 20 MVA
 Transformer
20KV/400 KV, Capacity 100 KVA
 Firefighting
system for transformers
 Medium
voltage panels 66 KV
 Medium
voltage panels 20 KV
 Low
voltage panels.
Supplying and installing
materials to operate and equip the transferring center
for Basel AlAsad Martyr Hospital in AlThawra
Al-raqqa city
- Transforming Station 20 KV / 400 KV, capacity 1000
KVA with inlet and outlet panels.
Supplying and installing
three transforming centers for Al-Qamishly, Ras Al-ein
and Al-Malikieh hospitals.
For the General Organization for Land Development
- Transforming Station 20 KV / 400 KV, capacity 1000
KVA with inlet and outlet panels.
Supplying and installing the electrical equipments
for Basel AlAsad Martyr Hospital project in AlThawra,
120 bed.
For the Military housing Establishment
branch 32 Al-raqqa
 Complete
busbar system with a capacity up to 2000A
 Lightening
protection net, using Faraday cage and Franklin neddel
 Power
factor improving cells to raise the value from 80%
to more than 95%
UPS in different capacities.
 Cranes:
up to 1000 Kg
 Standby
generating sets 630 KVA
Supplying electrical panels
and internal feeding cables for 120 beds in Al-Qamishly,
Ras Al-ein and Al-Malikieh hospitals.
For the General Organization for Land Development
Electrical panels to get the electrical current in
and to distribute it to all the hospital sections,
qty /70/
Installing Busbar systems
for Al-Kamishly, Ras Al-ein and Al-Malikieh hospitals.
For the General Organization for Land Development-
Insulation busbars, with a capacity up to 2000 A
Importing
equipments for Busbar systems for Al-Aamishly, Ras
Al-ein and Al-Malikieh hospitals.
For the General Organization for Land Development
Insulation busbars, with a capacity up to 2000 A
Supplying electrical busbar
systems, supervising on the installation for Al-Rastan
and TalKalakh hospitals.
For the General company for Building and Construction
Insulation busbars, with a capacity up to 2000 A
Supplying and installing
busbar systems for Al-Rastan and Tal Kalakh hospitals.
For the General
company for Building and Construction
Insulation busbars, with a capacity up to 2000 A
Supplying and installing
busbars, gensets and reansforming centers for Al-Bab
and Izaz hospitals in Aleppo.
For the General company for Building and Construction
 Insulation
busbars, with a capacity up to 2000 A
 Genset
1000 KVA, Qty /4/ controlled by a PC.
Importing and delivering
UPS feeding system /30/ KVA for Basel AlAsad Martyr
Hospital project in Salkhad.
For the Military housing Establishment branch
14 in Al-Swaidaa
Supplying and installing power factor improving cells
and low voltage protection panels for Al-Bab and Izaz
hospitals in Aleppo.
For the General company for
Building and Construction
To raise the value from 80% to more than 95%
Supplying and importing
a medical panel and head units for Al-Kamishly hospital.
For the General Company for hydro projects-Alhasakeh
Importing Electrical devices
for Ras-Alein and Al-Malkieh hospitals.
For the General Company for hydro projects-AlhasakehTo
medical panels for operation rooms, lighting devices
and head units.
|